Customization: | Available |
---|---|
Application: | Construction, Overhead, Underground, Industrial, Power Station, Telecommunication, Building, House |
Voltage: | Low and Medium Voltage Cable |
Still deciding? Get samples of US$ 1/Meter
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Chinese Type | Short time | Description | Primary applications | |
Copper conductor | Aluminum conductor | |||
JKV | JKLV,JKLHV | Covered line wire Service drop cable Secondary UD cable |
PVC insulated aerial cables | For aerial power transmission application |
JKY | JKLY,JKLHY | PE insulated aerial cables | ||
JKYJ | JKLYJ,JKLHYJ | XLPE insulated aerial cables | ||
JKLGYJ | Steel reinforced aluminium wire with XLPE insulated aerial cable |
For aerial power transmission application | ||
For aerial power transmission application, able to bear moderate pulling force. |
Rated voltage | Operating temperature of different insulationºC | Temperature while installing |
Accepted bending radius(mm) | ||||||
Long-time is allow | Short-circuit(within 5s) | ||||||||
PVC | PE | XLPE | PVC | PE | XLPE | ||||
D<25 | D≥25 | ||||||||
1kV | 70 | 70 | 90 | 160 | 130 | 250 | ≥0ºC | ≥4D | ≥6D |
Chinese Type | Number of cores | Nominal cross section(mm²) | Standards |
JKV,JKLV ,JKLHV ,JKY,JKLY,JKLHY, JKYJ ,JKLYJ,JKLHYJ ,JKLGYJ,JKLGY |
1 | 16~240 | GB/T12527-2008 GB/T1179-2008 |
Code | Phase Conductors | Bare Neutral | Nominal Weight | Ampacity | Standard Package | |||||||
Size/NO. of Wires | Insulation Thickness |
Nominal Diameter | Size/NO. Of Wires | Rated Strength |
XLPE | AL/Alloy | Total | Coils | Reels | |||
Bare | O.D. | |||||||||||
mm | mm | mm | kg | kg/km | A | m | m | |||||
AAC | ||||||||||||
Pekingese | 6-1 | 1.14 | 4.1 | 6.4 | 6-7 | 255 | 20.8 | 72.9 | 94 | 78 | 305 | 1000 |
Collie | 6-7 | 1.14 | 4.6 | 6.9 | 6-7 | 255 | 23.8 | 72.9 | 97 | 78 | 305 | 1000 |
Cocker | 6-7 | 1.52 | 4.6 | 7.7 | 6-7 | 255 | 32.7 | 72.9 | 106 | 78 | 305 | 1000 |
Dachshund | 4-1 | 1.14 | 5.2 | 7.5 | 6-7 | 400 | 26.8 | 114.6 | 141 | 103 | 305 | 500 |
Spaniel | 4-7 | 1.14 | 5.9 | 8.2 | 6-7 | 400 | 29.8 | 116.1 | 146 | 103 | 305 | 500 |
Cairn | 4-7 | 1.52 | 5.9 | 8.9 | 6-7 | 400 | 40.2 | 116.1 | 156 | 103 | 305 | 500 |
Doberman | 2-7 | 1.14 | 7.4 | 9.7 | 2-7 | 612 | 38.7 | 184.5 | 223 | 136 | 152 | 500 |
Airedale | 1-19 | 1.52 | 8.4 | 11.5 | 1-7 | - | 56.5 | 233.6 | 290 | 158 | 152 | 500 |
Basset | 1/0-7 | 1.52 | 9.3 | 12.4 | 1/0-7 | 903 | 64.0 | 294.7 | 359 | 182 | 152 | 457 |
Malemure | 1/0-19 | 1.52 | 9.4 | 12.5 | 1/0-7 | 903 | 64.0 | 294.7 | 359 | 182 | 152 | 457 |
AAAC | ||||||||||||
Chihuahua | 6-1 | 1.14 | 4.1 | 6.4 | 6-7 | 499 | 20.8 | 72.9 | 94 | 78 | 305 | 1000 |
Vizsla | 6-7 | 1.14 | 4.6 | 6.9 | 6-7 | 499 | 23.8 | 72.9 | 97 | 78 | 305 | 1000 |
Harner | 4-1 | 1.14 | 5.2 | 7.5 | 4-7 | 798 | 26.8 | 116.1 | 143 | 103 | 305 | 500 |
Whippet | 4-7 | 1.14 | 5.9 | 8.2 | 4-7 | 798 | 29.8 | 116.1 | 146 | 103 | 305 | 500 |
Schnauzer | 2-7 | 1.14 | 7.4 | 9.7 | 2-7 | 1270 | 38.7 | 184.5 | 223 | 136 | 152 | 500 |
Afghan | 1/0-7 | 1.52 | 9.3 | 12.4 | 1/0-7 | 2023 | 64.0 | 296.1 | 360 | 182 | 152 | 457 |
Heeler | 1-19 | 1.52 | 9.4 | 12.5 | 1/0-7 | 2023 | 64.0 | 296.1 | 360 | 182 | 152 | 457 |
How do you control the quality?
QC department will control the quality during the full production process.
Inspector will inspect each item according to the order, inspection report will transfer to you before loading.
Any third party inspection will be accepted during the production or before loading, such as SGS, BV, etc.
After-sale dept will follow the order and pay high attention on the feedback from your side after all the products delivered. Any quality problem, we will arrange the technical personnel to solve and bear the corresponding customer losses..
What if the cable we need have some differences on specifications from yours?
Any differences, we can design and produce according to your requests.
What's the package of the goods?
Usually wooden or steel drum or coil, or according to your requirement
What's the lead time?
Usually 10-30 working days.
Welcome your inquiry and email soon......